testimonials by pdh engineers
 
 

Typical costs of seismic rehab of existing buildings

Quiz Questions:

   
1. "Typical costs" is the mean structural cost of the seismic rehabilitation of a building based upon the database gathered and does not include the cost of replacing architectural finishes.
       
    True
    False
       
2. The seismicity of the building location is categorized as low, moderate, high and very high.
       
    True
    False
       
3. What does table 1.2.2 illustrate about?
(Refer Pg 1-4)
       
   

Seismicity Categories

   

FEMA Building model types

   

Performance categories

   

None of the above

       
4. Protects some feature or function of the building beyond life-safety, such as protecting building contents or preventing the release of toxic material is called immediate occupancy.
       
   

True

   

False

       
5. The database does not differentiate between costs associated with a rehabilitation performed as a direct response to observed structural damage after an earthquake and costs associated with a planned rehabilitation.
       
   

True

   

False

       
6. What does table 1.5.1 illustrate about?
(Refer Pg -1-13)
       
   

FEMA Building model types

   

Schematic of cost options

   

Typical structural costs

   

None of the above

       
7. What does FEMA stand for?
       
   

Federal Emergency Management Agency

   

Federal Emergency Management Association

   

Federal Equipment Management Agency

   

None of the above

       
8. The direct costs represent the bill received by the owner from the contractor.
       
   

True

   

False

       
9. Financing is an independent variable unrelated to the project characteristics and dependent on the type of owner.
       
   

True

   

False

       
10. The cost for structural work performed by the contractor and the sub-contractor is called Structural Rehabilitation Costs.
       
   

True

   

False

       
11. The cost for architectural work necessitated by the structural work is called Demolition and Restoration Costs.
       
   

True

   

False

       
12. The building or fire department may require an owner to upgrade fire protection and other life safety provisions.
       
   

True

   

False

       
13. The cost data include costs associated with extensive removal and replacement of architectural finishes or other nonstructural aspects that must always be considered during seismic rehabilitation is called architectural renovation.
       
   

True

   

False

       
14. The cost to repair structural damage from previous earthquakes, settlement, or deterioration in elements of the building not affecting the seismic performance of the building is called Damage repair costs.
       
   

True

   

False

       
15. The cost to remove hazardous materials, such as asbestos, lead paint, or contaminated soil is called Hazardous Material Removal Costs.
       
   

True

   

False

       
16. Design fees cover the costs of design professionals such as structural, engineers, architects, geotechnical engineers, civil engineers, surveyors, and cost estimators required to perform the studies and design work necessary for structural work and architectural refinishing work.
       
   

True

   

False

       
17. The performance objectives are defined by three general categories:
  1. Life safety;
  2. Damage control; and
  3. Immediate occupancy
       
   

True

   

False

       
18. Age can be an important cost factor because older buildings often require more new structural lateral elements an also because the existing system may suffer detioration.
       
   

True

   

False

       
19. The total construction cost is the bid amount or the cost estimate from a detailed seismic study including the contractor's overhead, profit, and contingency costs.
       
   

True

   

False

       
20. The cost to relocate occupants and equipment due to the disruption expected by the construction is called Management Costs
       
   

True

   

False

       
   
 
 

Copyright © 2005 paylessPDH.com. All rights reserved