Forensic engineering #2

Quiz Questions:

   
1. As a forensic engineer in your field, your job is to determine “what happened in the accident”. Your job is not to try to win or lose a case. That’s the attorney’s job.
       
    True
    False
       
2. In case # 1 the flood damage was caused by Hurricane.
       
    Katrina
    Charley
    Frances
       
3. In case #2 hurricane Katrina completely destroyed a house in Mississippi.
       
    True
    False
4. Case #3 is about hurricane damage to a house
       
    True
    False
       
5. Case # 4 is about hurricane Frances and Jeanne damage to a country club
       
    True
    False
       
6. In case #5 the foundation movement of the house was caused by the flood.
       
    True
    False
       
7. The following factors can contribute to foundation movement of a house.
   
  • Natural soil movement and soil expansion and shrinkage due to the
    amount of moisture in the soil during the seasons.

  • Mature trees in the property and their distance from the house.

  • Foundation movement between the additions to a house and original house structure.

  • Any plumbing leak underneath the foundation that could cause the soil to expand.
 
    True
    False
       
8. Case #6 is about discovering termite damage in a newly purchased house.
       
    True
    False
       
9. In case # 6 the termite damage had compromised the structural integrity of the house.
       
    True
    False
       
10.   In case # 11 the main crack damage on top of the acrylic half circle dome above the
foyer was caused by.
       
    Attempted break-in to the high school
    Hail damage
    Expansion and contraption of acrylic material due to temperature gradient during the seasons.
       
11.   In case #12 the cracks on the wall of the church was caused because:
       
    Soil movement due to seasonal variation in the soil moisture content underneath the church causing the foundation to move.
    Hurricane Charley
    Bad drywall material
       
12. In case #13 all the damage to the roof of the warehouse was caused by
       
    True
    False
       
13. In case # 15 the pier was never hit by a ship.
       
    True
    False
       
14. When clay base soil is wet, it swells and the foundation rises. When it’s dry, clay soil shrinks and the foundation settles. The repeated expansion and shrinkage of the soil underneath the foundation will cause the structure to get loaded under it’s own weight in tensile and compression. At the same time all these expansion and shrinkage will cause the soil to lose it’s bearing capacity.
       
    True
    False
       
 
       
15. In case #7 (of Ethics section); It was alleged that Dr. Smith conducted an engineering inspection for his client in December 1998; but did not provide his client with his inspection report until February 2000. This Indicated that he was not acting as a faithful agent for his client and his actions were not in keeping with generally accepted engineering standards and procedures. The Board accepted a Consent Order signed by Dr. Smith for a formal reprimand
       
    True
    False
       
16. 16- In case #11 (of Ethics section); It was alleged that Mr. Doe, a Texas PE engineer, altered boundary information on Survey plats for a subdivision that had been prepared by a license surveyor, affixed a copy of the surveyor’s seal to the plats and submitted the plats to county officials for approval without knowledge of the surveyor. The Board reportedly suspended his license for one year and fined him $1000.00
       
    True
    False
       
17. 17- In case # 15 (of Ethics section); It was alleged that Jim, the company’s president, designed seven swimming pools and affixed a copy of a Texas Professional engineer’s seal and signature that he had obtained from another source to the plan sheets which were submitted to a city for permitting. Board records did not show that Jim was licensed as a professional engineer in Texas nor that his company had Texas professional engineer as a regular full-time employee. The Board accepted an Agreed Board Order signed by Jim to cease and desist from any and all representations that his company can offer and/or perform engineering services and from the actual performance of engineering services until such time as the company hires a Texas licensed professional engineer as a regular full time employee, and to immediately discontinue the use of the Texas professional engineer’s seal and signature on any and all documents. Jim also agreed to hire a Texas professional engineer to perform after the fact engineering inspections and issue certification reports for the five swimming pools that were permitted and constructed. The company was also ordered to pay a $5000.00 administrative penalty.
       
    True
    False
       
 
 
 